When performing repairs before proceeding to the step of laying linoleum, it is worth wondering how much dry bulk floor under the linoleum. After all, this option will depend on all your further actions. There are a number of factors which determine the period of drying the liquid surfaces.

What determines the drying time
The content of the article
- What determines the drying time
- various coatings polymerization Period
A liquid base gradually begins to dry within an hour after you have it will inflict on the surface. Finite time required for complete drying will depend on some of the features, we list the main ones:
- Type of mixture used.
- The number of layers applied.
- Use of various additives.
- The thickness of each layer.
- Protection type finish.
REFERENCE. In most cases, already one hour after the execution of works for applying a liquid base, it gradually begins to dry. For a complete drying of the average will take at least 5 hours.
various coatings polymerization Period
Each manufacturer specifies in the package with a mixture of self-leveling floor for the estimated time needed for its polymerization. Consider the main types of compositions for self-leveling floor and thus the time required for drying them:
- Polymer surfaces. For their drying can require from 2 to 6 days in each case, this period will be individual depends on the presence of additives in the composition, special additional components, thickness, and the number of layers.
-
Coatings based on cement. When selecting this type of foundation, be prepared for the fact that the need to allocate sufficient time for drying. Most often this type of mixture used in private construction. For the polymerization will be required from 7 to 14 days.
- The gypsum mixture. Selecting the mix, you will be able to enter the room after two days, but to install furniture or a piece of equipment can be no earlier than 10 days.
- Quick-drying surface. Here everything is quite fast. For complete drying such mixture must be take about 2-5 hours.
- Polyurethane surface. By selecting such a composition, you can walk on the finished surface after 10-15 hours, but complete polymerization occurs only after the third day.
Having familiarized with the period of polymerization of the basic structure, you will be able to efficiently distribute schedule repairs.