Everyone who wants to build their own house will certainly think about what time of the year it is best to start construction. Of course, today the technology has gone far ahead, and construction can be carried out under any weather conditions. But it’s important, after all, to lay the foundation in time, which is the basis of the future structure. But to do this in the winter is not yet possible.

Therefore, it is best to choose a spring or autumn period to start digging a pit. And in fact, and in another case, there are pros and cons.
Spring
With the beginning of soil thawing, you can start digging a trench under the foundation. If the house is planned from a tree or a bar, then in the summer they begin to build walls. In the case of a stone or block house, experts recommend waiting a year for the foundation to shrink. But some begin to lay out the plinth within three weeks after the cement hardens in the ground.

The advantages of the spring launch are as follows:
- Good weather for work;
- Favorable conditions for concrete hardening;
- By autumn, you can get a box at home without interior decoration.
But there are many drawbacks:
- In spring, groundwater rises that may not allow you to build a house with a basement or basement;
- Heat and rains also affect the quality of the foundation: at high temperature it will not gain strength, and heavy rains erode the surface and deform it;
- Construction will take place in the summer season, when it is difficult to find good workers, and the prices for building materials are the highest.

Autumn
It is reasonable to fill the foundation in the fall. Then, in the case of a wooden house, the log house can be installed even in winter, and in the spring continue decoration. It is better not to put a brick in cold weather unless absolutely necessary. But during the winter, the foundation will settle, and in the spring you can start immediately to the construction of walls and a basement.
The advantages of this tactic are as follows:
- In autumn, you can purchase materials at a discount, pick up good craftsmen;
- The foundation is poured in cool weather, which will allow concrete to mature properly.
The autumn start of construction also has disadvantages:
- It is necessary to have time to fill the foundation at a temperature above + 5 ° C, otherwise it may freeze, crack and crumble in the spring;
- It may be necessary to add special anti-freeze additives to concrete, and this will certainly increase the total cost of the foundation;
- In autumn, the risk of delaying work due to prolonged rains and an increase in heating and electricity costs increase.
If the frame house is on a pile-screw foundation, then you can start construction and conduct it at any time of the year.

Before deciding on the time of the start of construction, it is best to consult with specialists and evaluate their strength so that the construction does not turn into an incomplete object.
-
What are the consequences of building a site without permission?
-
How to dock a carpet so that it does not go in waves
-
Why in the homes of SIP panels can not forget about good ventilation
-
How to make a rectangular cutout in ceramic tiles
-
How to cut glued tiles on a wall
-
When is it better not to glue paper wallpapers?
-
What material can you quickly build a house from
-
What help should be provided for poisoning with paint fumes
-
What to do if the last heating battery does not heat
-
What installation errors lead to the leakage of the polycarbonate canopy
-
What yellow spots appear on the wallpaper after gluing
-
What primers are not suitable for application under fiberboard
New publications are published daily on our channel in Yandex. Zen
Go to Yandex. Zen