Is it possible to connect gas to an unregistered house and how to lay a gas pipeline in an "unfinished"

click fraud protection

The question of whether it is possible to connect gas to an unregistered house is of interest to many. Agree that gasification is not only a guarantee of comfort, but also a necessity in the current realities. Since it is not very convenient to use gas cylinders, it is advisable to be patient, collect a package of documents and bring gas into the house.

It should also be noted that in the event of a house sale, the connected gas will increase the value of the property. We will tell you what documents are required to carry gas to an unregistered house, all stages of the procedure, and we will also help to make the process as simple and fast as possible.

The content of the article:

  • Conclusion of a gas supply agreement
  • Gasification of the house
    • Obtaining technical specifications
    • Gas supply project development
    • Registration of power of attorney for gas connection
  • Gasification of a private house: new rules
  • The choice of the contractor for conducting gas
  • The cost of gasification of an unfinished house
  • Conclusions and useful video on the topic
instagram viewer

Conclusion of a gas supply agreement

Gas equipment is distinguished by simplicity, safety and environmental friendliness, blue fuel attracts with environmental priorities, low price, and ease of use.

According to the Federal Law "On Gas Supply in the Russian Federation" No. 69-FZ dated March 31, 1999, the following are involved in gas supply:

  • gas distribution organizations involved in the transportation of raw materials to consumers;
  • gas transportation organization engaged in pumping gas through main gas pipelines (leased or own);
  • gas transmission system - is an intermediary between the producer and consumer of raw materials;
  • gas supplying organization - concludes an agreement with the consumer for the supply of gas.

To conclude a contract, a private person draws up a statement (offer), where he informs about his intention to join the gas pipeline.

Signing a contract

Regardless of the form of ownership, gas is supplied only after the conclusion of an agreement between the fuel supplier and the consumer

The first step towards gasification is the filing of an application (offer).

Gasification of the house

To get permission for laying a gas pipeline to a private house you need to collect an impressive package of documents and go through four stages:

  • obtaining technical specifications;
  • project development;
  • installation of gas pipeline equipment;
  • connection.

Required documents:

  • application for gasification from the owner of the property;
  • passport of a citizen of the Russian Federation;
  • title deed where gasification is planned;
  • if the pipeline will be laid through adjacent sections, the written consent of their owners for such a procedure is required.

Often, owners start the gasification process when the house is still under construction. Naturally, they are interested in whether it is possible to supply gas to an unfinished and still unformed house?

In this case, in addition to the documents listed above, additional papers must be provided:

  • ownership of a plot of land where construction is being carried out;
  • a copy of the registration certificate for the building under construction, brought in by a notary;
  • application for obtaining technical specifications (technical conditions);
  • written confirmation of the territorial state body of the legality of construction work.

The connection of an unregistered house is carried out as gasification of an auxiliary building, not a residential one.

Obtaining technical specifications

TR are necessary in order to design an outdoor gas pipeline and in-house gas supply system. To obtain a technical specification, you should contact the gas service to establish whether there is enough capacity for connection.

Required papers:

  • land ownership;
  • floor plan of the house or permission for its construction (must be certified by the district "Architecture");
  • site plan on a scale of 1: 5,000;
  • a statement signed by the head of the Gas Trust.

The minimum preparation time for technical specifications is 2 weeks. The term can be extended up to one month. In practice, the approval takes much longer.

GorGaz specialist makes connection

After accepting the application for gasification, according to the legislation, the gas connection must take place within three months

TU is valid for up to two years. After this time, the gas pipeline must be built.

Gas supply project development

After the owner receives the technical specifications for the supply of gas, a project is developed.

The following package of documents must be submitted to the design organization:

  • THAT;
  • geodetic survey of a personal plot with all communications and buildings with reference to the area;
  • all documents for the construction;
  • for gasification of a non-residential building (unfinished), a sheet of technical characteristics is required (the building must be at least 70% ready).

After that, you should call the wizard, who will carry out all the necessary measurements and draw up the documentation. Consideration of the project is carried out within 15 working days. The next step is to pay for the project. The cost of the service depends on the distance between the facility and the gas pipeline.

Building gasification project

For an unfinished project, two projects are needed. In one, the gas supply system of the building is displayed, where construction is unfinished, and in the second, on the contrary, for completed housing

The project takes into account all gas appliances that are planned to be installed in the house (floor boiler or wall-mounted instantaneous water heater, gas stove, fireplace, etc.). This is done in order to calculate the required volume of raw materials.

The consumed volume of gas is indicated in the equipment passport. In addition, you must also provide a plan for the location of appliances in the house.

Gasification scheme for a private house

The customer must check the finished project so that later he does not have to redevelop the premises.

Once the paperwork has been completed, assembly and construction work begins.

Registration of power of attorney for gas connection

Gasification is a difficult and lengthy process. Not all owners have enough free time to personally deal with this issue.

In this case, a power of attorney is drawn up for a private person who represents the interests of the owner of the house. This document must be certified by a notary and attached to other papers.

Gasification of a private house: new rules

On June 6, 2019, the "Rules for the design of gas consumption systems" (SP 402.1325800.2018) entered into force, according to which, a permit for gasification of private houses will be issued only after all requirements are met:

  1. Gas boilers are allowed to be placed in the basement or on the basement floor. Installation of no more than two gas boilers or water heaters is allowed in one room.
  2. In the special room, it is allowed to install only double-glazed windows, which can be easily knocked out if necessary.
  3. In the living space, there must be devices that monitor the temperature and pressure in the gas system, as well as meters that take into account the gas consumption.
  4. All gas equipment must be certified and have all the necessary documents.
  5. The connecting hoses must be no longer than 1.5 meters and are watertight.
  6. When installing a gas stove, the distance to the opposite wall should be at least one meter.
  7. The gas stove must comply with the standards of GOST 33998, have a "Gas-control" system, as well as a dielectric coupling between the tap and the hose to protect against stray current.

The ceiling height in the kitchen must be at least 2.2 meters.

Layout of gas equipment

If the stove has two burners, then the volume of the room is at least 8 cubic meters. When installing a 3-burner stove, the room volume increases to 12 m3, and for a 4-burner - 15 m3

To ventilate the room, it is necessary to have a window, an exhaust hood and a gap under the door.

The choice of the contractor for conducting gas

When the question of how to supply natural gas to an unfinished house has been resolved, and the project is ready, the owner must choose an organization that will carry out gasification of the building. It must have a license and be registered in the register of GorGaz.

For those who do not wish to cooperate with GorGaz, its employees issue technical specifications for the development of the project. With this document, you should contact the selected organization.

Some companies are engaged in both installation and design work. A complex order of services will save up to 25%. In order to prevent misunderstandings, it is recommended to conclude a contract with the installer.

Welding works

GorGaz can independently carry out design, construction and installation work. If the project is developed by a third party, the documentation must be checked with the local GorGaz

At the design stage, you need to be as careful as possible. It is necessary to take into account not only technical, but also aesthetic parameters, since reconnection and transfer of gas equipment requires agreement with the gas service and financial costs.

After the installation of the gas pipeline and related equipment, the new gasification facility must be accepted by a special commission consisting of GorGaz employees. The commission checks the object only if it is completely ready for connection. Consideration of the issue takes at least two weeks.

The maximum term is one month. If no violations are found, together with a positive answer, the owner receives a receipt for payment of the decision of technical supervision.

It is strictly forbidden to independently engage in the laying of the gas pipeline, as well as the installation of gas distribution inside the room, it is strictly forbidden to connect gas equipment. All unauthorized actions are subject to a fine.

The cost of gasification of an unfinished house

The cost of installation work is different for all organizations. Regionality also affects the price.

The connection cost includes:

  • gasification project fee;
  • earthworks (if necessary);
  • tie-in to the street gas pipeline;
  • gas pipes (internal and external);
  • installation and connection of the meter.

If the throughput of the gas pipeline is exhausted, then the connection is impossible.

Gas pipes

It is advisable that a pipe of the maximum permissible diameter be brought to the house. This will allow in the future to connect additional equipment and gasify new outbuildings.

All gas appliances must remain in place. They can be moved only after agreement with the gas workers. GorGaz employees have the right to go home and check the plan they have with the actual location of the equipment and, in case of non-compliance, levy thousands of fines.

Conclusions and useful video on the topic

Important points when laying a gas pipeline into a house:

All about gasification of a private house:

Gasification process from A to Z:

Gas can be supplied to an unfinished house. The procedure is almost identical to the gasification of a residential building. There are only minor differences in the list of documents. If you do not have time to run around in instances, entrust it to intermediaries. To do this, it is enough to issue a power of attorney.

Have you supplied gas to an unregistered or unfinished house, stepped on the "rake" and coped with difficulties brilliantly? Do you have experience with the gas service or do you know which organizations are best to stay away from? Or maybe you have some valuable advice to avoid mistakes? Share your experience in the comments and ask questions to experts.

Hydraulic gas pipeline calculation: calculation methods + calculation example

Hydraulic gas pipeline calculation: calculation methods + calculation exampleDocuments And Design

For safe and trouble-free operation of gas supply it must be designed and calculated. It is important to perfectly match the pipes for all types of pressure lines, ensuring a stable supply of gas ...

Read More
How to design a gas pipeline: designing a gas supply system

How to design a gas pipeline: designing a gas supply systemDocuments And Design

The organization of gas supply is the most important moment of arranging comfortable housing. Practice shows that most often this type of fuel is chosen to ensure the operation of household applia...

Read More
Looping pipeline: its functions and features of arrangement for the pipeline

Looping pipeline: its functions and features of arrangement for the pipelineDocuments And Design

All pipelines are built taking into account the consumption of natural gas by all existing customers. But during the operation amount of the gas used often grows and once the available capacity to ...

Read More
Instagram story viewer