The rapid growth in the number of construction projects inevitably entails a high demand for concrete delivered in a special transport - concrete mixer. We suggest you familiarize yourself with the main features of this service in order to avoid surprises and unnecessary financial expenses when ordering ready-made concrete.
First of all, you must always be in touch. This is due to the fact that, before sending the car, as a rule, the dispatcher makes a control call in order to make sure that the customer is ready to accept concrete.
Unloading of the arrived car is carried out in the time period established by the contract. Most often, no more than one hour is provided for unloading, but in the presence of special conditions this figure can be adjusted. The main thing is not to forget to stipulate all the features in advance, since overtime is regarded as simple and is included in the cost account.
Refusal to pay for downtime is not infrequently a cause of disagreement and conflict, even to the extent that the supplier can suspend the upload until settlement. In order to avoid the occurrence of such situations, it is better to adjust all disputed points in advance.
To the extent that mixing concrete is an irreversible process, any difficulties that prevent unloading are entirely the buyer's responsibility. Therefore, before the control call, prior to the dispatch of the transport, you should make sure repeatedly that the arrived concrete will be unloaded.
The availability and quality of access roads to the unloading facility also significantly affects the success of the planned delivery. The inability to drive the car to the unloading place lies with the responsibility of the customer. It is necessary to first assess the state of travel, and if in doubt, coordinate this with the representative of the supplier.
It is important to remember that concrete that has deteriorated to the extent of the impossibility of unloading it or passing vehicles to the object is the property of the customer. If the goods are delivered without prepayment, the supplier will have the full right to demand compensation for non-fulfillment by the customer of his obligations.
A concrete mixer arriving at a construction site must be checked for fullness even before unloading. This will make sure that the ordered concrete volume is provided in full, and also eliminate the possibility of disagreement if it turns out that the material was not enough.
Before ordering concrete delivery in a mixer from a particular manufacturer, it is recommended that you first request a material for a sample. Thanks to this, it will be possible to know for sure that the quality of concrete meets all the requirements.
- Why it is not recommended to build a hollow brick house
- Why is it important to know the weight of the brick before construction
- Than cellular polycarbonate is better than monolithic
- What type of corrugated board is the most common for roofing
- Where a cheap substandard corrugated board is useful in construction
- Typical errors in the installation of wall panels from corrugated board
- Embossed tile: what is worth knowing before purchase?
- Popular materials for construction
- What is the advantage of building houses from wood concrete slabs
- Facing tile: types and characteristics
- Gutter systems: types, materials, characteristics
- Why you should not use expanded clay as a heater
New publications are published daily on our channel in Yandex. Zen
Go to Yandex. Zen