After the completion of repair work, very often the owners have to deal with defects of the masters. As a rule, most hidden flaws can be detected after some time after the calculation. We suggest that you familiarize yourself with some recommendations that will tell you how to properly accept the work in order to exclude unpleasant finds in the future.

It is important to consider that the process must be phased. Each gap is best recorded in the corresponding act, and meticulousness is the best assistant to the reception procedure.
In most cases, the initial stage of reception includes work related to dismantling. It can be old communications, partitions and other elements. It is best to have a preliminary plan of such work. It will allow you to structure the entire process, as well as to ensure that workers do not cause damage.

Waterproofing and communications
Properly executed waterproofing of the floor involves not only screed, but also the processing of the lower part of the walls. If builders ignore this nuance, then all work loses its meaning, as moisture can flow through the ceiling.

Reception of all utilities is best done in the presence of a specialist from the operating company. If there are no violations, then the act signed on their part will be a powerful argument in emergency situations.

Wiring
Sockets, to which household appliances will be connected in the future, must be connected with copper wires of sufficient cross-section.
Rough finish
It is customary to check the screed and plaster by tapping the surface. The presence of an empty sound will indicate the presence of marriage. The strobes should be vertical. This eliminates the possibility of cable damage when drilling walls.

The placement of outlets is better to provide in the preliminary plan. This will eliminate their spontaneous placement at the discretion of the builders.

Final reception
First of all, the operability of all electrical components, as well as the distribution panel, is checked. All surfaces should be uniform in color, and windows and doors should open without hindrance. The bathroom should not be excess moisture or smudges.

In order for the process of accepting work to occur sequentially, it is best to draw up intermediate acts. This will eliminate the occurrence of unnecessary disagreements between the customer and the contractor, as well as not to lose anything at the reception.
-
When an adjustable floor is more profitable than a capital screed
-
What mistakes are made when the radiator is connected diagonally?
-
What are the consequences of building a site without permission?
-
What errors lead to water hammer in the heating system and how to avoid them
-
Why does the grinder work, but the disk does not spin
-
What could cause the cabinet door to bend
-
5 reasons to change the wizard without waiting for the repair to finish
-
How to cut tiles without dust
-
How to cut a fiberboard with a flat edge with a regular grinder
-
Why you should not put aluminum radiators on central heating
-
Why you can not allow for flaws in the installation of roof nodes from corrugated board
-
What boards can not be used for half-timbered
New publications are published daily on our channel in Yandex. Zen
Go to Yandex. Zen