Contract for maintenance and finishing works: example for download - Setafi

The contract for repair and finishing works is drawn up in writing. It describes in detail the types of work, the cost, the timing of their implementation, the procedure for acceptance, as well as the duties and responsibilities of each party. How to draw up such a document is described in detail in the material presented.

Repair and finishing works

The content of the article

  • Compilation Instructions
  • How to make an application

Compilation Instructions

The contract for the performance of repair and finishing works is drawn up with a mandatory description of the types, cost, terms of work, and the obligations of each party. In general, the document consists of the following sections:

  1. Title, date and place of signing.
  2. The subject of the contract - here the obligation of the contractor to perform all the work is prescribed. Moreover, they are listed separately in the annex, which is an integral part of the contract.
  3. The cost clause also refers to the annex, since the cost is set separately for each type of work.
  4. The obligations of the contractor are connected not only with the performance of work, but also with the acquisition of materials, as well as responsibility for their quality. The contractor must qualitatively perform all the works listed in the annex within the established time limits. In addition, he undertakes to prevent unauthorized persons, to monitor compliance with safety regulations.
    instagram viewer
  5. The customer's obligations are to provide the work itself, to ensure the readiness of the facility for their implementation. The contract-estimate for the performance of work obliges the customer to carry out timely acceptance of work and pay for them in full in accordance with the prices indicated in the appendix.
  6. The next paragraph describes the procedure for the delivery and acceptance of the object. This fact is confirmed by the signing of a separate document, which is also included in the annex.
  7. The contract for repair and construction works contains a description of the procedure for resolving disputes and terminating the obligations of the parties to each other.
  8. If necessary, you can include the "Special conditions" section. Here they indicate the obligation of the parties regarding non-disclosure of information that became known in the course of work. You can also prescribe a condition on the possibility of concluding an additional agreement (if it is necessary to carry out work that was not originally planned).
  9. Details of the customer and the contractor, signatures with transcripts, seals of organizations.
Work agreement

How to make an application

At least 1 appendix is ​​made to the contract. The types of work are described in detail here:

  • Name:
  • units;
  • volume;
  • price;
  • amount for each type of work;
  • total amount.
Treaty

As in other cases, the contract is drawn up in 2 written copies. Both originals have the same legal force. When drawing up an additional agreement, it is necessary to indicate that it relates to this agreement and is an integral part of it.

Garmin Vivoactive 3: detailed review of the model – Setafi

Garmin Vivoactive 3: detailed review of the model – SetafiHomeElectronics

Garmin Vivoactive 3 is a smart watch with advanced functionality. The device supports contactless payment, is equipped with a variety of sensors to measure all basic parameters. Satellite modules a...

Read More
Rating of irons in terms of quality and reliability in 2021: TOP of the best for the home - Setafi

Rating of irons in terms of quality and reliability in 2021: TOP of the best for the home - SetafiHomeAppliances

creativecommons.orgAlthough there are many clothes made from fabrics that do not wrinkle, good options are still sewn from fabrics that are worth tormenting yourself near the ironing board. To alwa...

Read More
Why does the e3 error occur in the Gorenje washing machine? Ways to find a breakdown and fix it - Setafi

Why does the e3 error occur in the Gorenje washing machine? Ways to find a breakdown and fix it - SetafiHomeAppliancesWashing Machine

Error E3 in the Gorenje washing machine appears in situations where the water drain system fails. The easiest way to diagnose is to make sure that the pressure in the water supply is normal, inspec...

Read More