Why it is undesirable to fill piles with grillage

When installing a pile foundation with a reinforcing monolithic grillage, certain technical requirements should be observed. We will figure out what the nuances of the fill, as well as what the consequences may be if mistakes are made.

/

Piles

Since the question is about a monolithic device, then we will talk about bored piles. That is, wells are drilled in the ground, formwork material is installed in them, which usually performs the same function of waterproofing. Then, reinforcement is laid inside the formwork, the height of which must exceed the depth of the well by at least 0.4 m. This is a very important point. Subsequently, this reinforcement is bonded or welded to the grill reinforcing belt.

/

After all the details are immersed in the well, a solution is poured into it. Filling one well is done at a time, that is, in one go. You can’t fill in half of the volume, and fill in the rest for tomorrow. Then the concrete should be rammed with vibration or simply by piercing. It is necessary to let out all the air from the solution, otherwise the piles will be defective, which will affect the strength. Piles are flooded and you can proceed to further events.

instagram viewer

/

Grillage

In order to connect the piles with a monolithic grillage, the formwork is assembled. Moreover, the formwork should not lie on the ground, that is, the grillage should be in a slightly suspended state. This is done so that the soil does not cause damage to the structure. So, the sequence of actions:

  • We collected the formwork around the perimeter,
  • We installed support supports for the lower shields,
  • Paved inserts for laying the reinforcement belt,
  • Tied the fittings to the pins left in the piles,
  • Pour the solution
  • Sheathed with polyethylene for normal setting.
/

In this case, it is important to know:

  • If the interval between pouring the piles and the grillage is less than 12 hours, then before pouring the grillage, you should clean the top layer of concrete on the piles, remove the “milk”;
  • If more than 12 hours have passed, then there is nowhere to hurry, you should let the solution in the piles to seize, that is, wait 2-3 days.

Why is it important? For a period of 12 hours, a thin crust forms on the upper exit of the piles. That is, if less time has passed, then the solutions will begin to live together, and if more, then the strength of the piles will be violated. It should be remembered that the entire volume of grillages is also poured at a time.

  • Why you should not do dry cutting tilesWhy you should not do dry cutting tiles
  • How to make removable polycarbonate frames for a greenhouseHow to make removable polycarbonate frames for a greenhouse
  • What techniques will simplify the installation of polycarbonate in the connecting profileWhat techniques will simplify the installation of polycarbonate in the connecting profile
  • How to wash the surface of the material from the foam easily and quicklyHow to wash the surface of the material from the foam easily and quickly
  • How to lay a tile under a door frame without a thresholdHow to lay a tile under a door frame without a threshold
  • How to arrange the supply ventilationHow to arrange the supply ventilation
  • What is the best waterproofing of a bathroom under a tile?What is the best waterproofing of a bathroom under a tile?
  • How to cut a corner in a tile with a tile cutterHow to cut a corner in a tile with a tile cutter
  • How to quickly make repairs in the apartment with your own handsHow to quickly make repairs in the apartment with your own hands
  • How to mask nails on platbandsHow to mask nails on platbands
  • How to cut floor tiles diagonallyHow to cut floor tiles diagonally
  • What to do if the column of the second floor is wider than the firstWhat to do if the column of the second floor is wider than the first

New publications are published daily on our channel in Yandex. Zen

Go to Yandex. Zen/
How to change the dimensions of the door leaf

How to change the dimensions of the door leafWith Your Own Hands

The situation when the door you like is slightly inconsistent with the parameters of the existing doorway, alas, is not uncommon. Although resizing the door leaf is not considered an easy task, it...

Read More
How to cut GVL yourself with a simple knife

How to cut GVL yourself with a simple knifeWith Your Own Hands

Many, having read the information about the beneficial properties of GVL (gypsum fiber sheet), decide to use it for decoration. For most inexperienced people in construction, this is almost the sa...

Read More
How to stick wallpaper on your own is no worse than an experienced master

How to stick wallpaper on your own is no worse than an experienced masterWith Your Own Hands

Content 1 Surface preparation 2 Pattern Fit 3 What to do with glue? In the process of repair at the moment, the most popular finishing material for the walls are wallpaper. But it is worth say...

Read More